HL&P Fees & Rate Structure


Impact Fee Rates 2019 - PDF


Fee Description


Amount


Comments
Billing/Office Fees
•  Convenience Fee 3.0% Used on Impact Fee credit card payments only
•  Late Payment Charge (Compounded) 1.5% Applied on any past due amounts
•  Returned Payment Charge 15.00 Included in current schedule
•  Reconnect Fee 20.00 Included in current schedule
•  Service Application Fee 20.00 Included in current schedule
Construction Fees
•  Impact Fee Amperage Calc. Included in current schedule
•  Line Extension/New Development - Installation/Additional Design Bid Estimate Estimate for Labor, Materials, and Overhead provided upon request
•  Line Extension/New Development - Job Initiation Fee 200.00 Included in current schedule
•  Truck Roll Fee 50.00 Set fee for extra vehicle trips, i.e. reinspection, meter verification, troubleshooting customer side, etc.
Meter Related Fees
•  Meter Installation Fee 70.00 All new meter issuances regardless of reason, does not include replacement meters
•  Meter Fee Meter Cost Plus Cost of Meter rounded up to nearest $10
•  Meter - Nonstandard Meter - Monthly Meter Reading Charge 20.00 Typically those meters that must be manually read
•  Net Metering - Application Fee 300.00 Included in current schedule.
Device Fees
•  Generation Transfer Switch - Preliminary Inspection Fee 100.00 Verification trip for sizing and device appropriateness
•  Generation Transfer Switch - Installation Fee 100.00 Installation and meter re-installation
•  Outside Lighting (Yard Lights) $6.50/Month Set fee regardless of consumption levels


Rate Description


Amount


 
Energy Rates
Residential
•  Base/Customer Charge 13.70  
•  1st 1,000 kWh 0.0833/kWh  
•  All Additional 0.1037/kWh  
Residential/Small Commercial - Pumping
•  Base/Customer Charge 13.70  
•  Demand Rate 8.90/kW  
•  1st 500 kWh 0.061/kWh  
•  All Additional 0.061/kWh  
General Service - Small (1kW < X <= 30kW) (Single Phase)
•  Base/Customer Charge 11.00  
•  Demand Rate 9.50/kW  
•  1st 500 kWh 0.084/kWh  
•  All Additional 0.049/kWh  
General Service - Small (1kW < X <= 30kW) (3-Phase)
•  Base/Customer Charge 13.00  
•  Demand Rate 9.50/kW  
•  1st 500 kWh 0.084/kWh  
•  All Additional 0.049/kWh  
General Service - Medium (>30kW & <= 250kW)
•  Base/Customer Charge 40.00  
•  Demand Rate 10.80/kW  
•  1st 500 kWh 0.0574/kWh  
•  All Additional 0.0457/kWh  
General Service - Medium (>30kW & <= 250kW)
•  Base/Customer Charge 40.00  
•  Demand Rate 8.90/kW  
•  1st 500 kWh 0.061/kWh  
•  All Additional 0.061/kWh  
General Service - Large (> 250kW)
•  Base/Customer Charge 77.00  
•  Demand Rate 14.10/kW  
•  All kWh 0.046/kWh  
    Heber Light & Power
    The Company's mission is to be a leader in the Public Power Industry by safely providing reasonable rates and reliable energy with an emphasis on environmental responsibility, transparency, and a commitment to values and community while maintaining a highly skilled and motivated workforce.
      Proud Recipient of the
RP3 Safety Award
Heber Light & Power
31 South 100 West
Heber, UT 84032
Office (435) 654-1581
Outages (435) 654-2913