Solar contractors must send a representative to contractor orientation prior to installing generation on HL&P’s system.
Solar systems must be approved by HL&P prior to installation. Systems installed without approval prior to installation may not be allowed to connect to our system.
Please check with HL&P prior to selling systems to ensure that the address is eligible for distributed generation.
Some of our circuits are maxed out and do not have room for more distributed generation. The northern-most circuit in Heber City is one of these areas.
Contact Jared Wright for more net metering information.
phone: (435) 657-6427
email: jwright@heberpower.com
If you are considering solar, please contact us to find out if your address is eligible for distributed generation. We are unable to connect more distributed generation in some areas of our service territory.
The northern most circuit of Heber City is currently maxed out due to the Jordanelle Hydro-power plant generation being on this line. Until the Jordanelle to Midway transmission project and second point of interconnect are complete, the circuit cannot handle additional generation.
To learn more about allowable generation in your area, the connection process, our rates, or anything else related to net metering and energy consumption contact Jared Wright.
phone: (435) 657-6427
email: jwright@heberpower.com